Stage 13 · Component
Verb list
Each promise starts with the verb, printed as large as it fits.
Live
Buildproducts
I own a feature from the spec to production.
Multiplydelivery with AI
Specs, parallel tasks and review gates keep the speed from lowering the bar.
Leavea workflow behind
Your engineers keep shipping this way after I am gone.
Reasoning
Why it exists
A value proposition is easier to scan when every item opens with what gets done. The verb takes the heavy type, the rest of the phrase follows at label size.
How it fits
The verb is sized against its own column, so a longer word in another language scales down instead of breaking the layout.
Leave it out when
The items do not start with a verb. Forcing nouns into this shape loses the rhythm.
Props
| Prop | Type | What it does |
|---|---|---|
itemsrequired | readonly { verb; rest; body; color }[] | The verb, the rest of the phrase, the paragraph and a decal color. |